| Site Selection & Preparation |
 |
RF, Civil and MW surveys |
 |
Structural analysis of the building |
 |
Site Layouts (equipment, tower, DG, earth, etc) |
 |
Preparation of site reports |
 |
Foundation design of tower, shelter and DG set |
 |
Infrastructure Development |
 |
Electrification in Shelters of Cell Sites: We are taking up electrical projects for leading telecom
operators we undertake supply of material, earth pit work & shelter electrification. Earthing
System standards which we are following are as follows:
we are designing the earthing system to achieve the uniform earth resistance of less than 1
ohm at the site. The grounding system consists of the following Sub Systems: |
| |
 |
Earthing pits - 4 no, one for lightning protection of tower and equipment shelter, one for the
electronic equipment inside the shelter, one for the DG neutral earth and one for the DG
body earth. |
 |
Earth conductor runs from the lightning protection system, Principal ground bar maintained
as reference in the shelter for electronic equipment, DG neutral and DG body to the
respective earth pits. |
 |
Supervision of site infrastructure |
|
|
|
| BTS Site Implementation and Commissioning |
|
 |
Installation of BTS, MW and Power plant |
 |
Quality assurance |
 |
BTS,MW commissioning and site integration |
|
|
| Switch Site Implementation |
|
 |
Site Layout |
 |
Installation of MDF, DDF, FMS, Power plant and Batteries. |
 |